CEA Power Dashboard

Serbia Electricity Market Intelligence

Prices, renewable capture, cross-border signals, project economics and CEA market intelligence in one workspace.

Dashboard navigation
Selected: 26 Jul 2026 - 24 Aug 2026Time zone: Europe/BelgradeData coverage is shown beside each dataset.Compare: 26 Jun 2026 - 25 Jul 2026

Project Economics

Editable solar, wind, BESS and hybrid project scenarios with transparent hourly energy and price assumptions.

Revenue and price assumptions

Futures settlements anchor monthly averages while preserving the historical hourly shape. This is a scenario, not a live hourly forecast.

unavailable
EUR/MWh
%/yr
Futures data may be unavailable, partial, stale or sourced from a public snapshot. The displayed fallback is explicit and no futures price is fabricated.
No verified futures settlement was available; no futures value was fabricated.
2026-01: no matching futures settlement; explicit manual fallback used.
2026-02: no matching futures settlement; explicit manual fallback used.
Provider / source
unavailable
Latest trading date
-
Profile source
Indicative deterministic demo profile
Calculated
-
Contracts used
None
Annual generation
10.7 GWh
Net capacity factor
12.3%
Capture price
44.3
EUR/MWh
Capture rate
59.1%
Blended realised price
58.8
EUR/MWh
LCOE
81.2
EUR/MWh
EBITDA year 1
495.8 kEUR
Project IRR
4.3%
NPV
-2.2 mEUR
Payback
15.1 y
DSCR
0.89
Break-even PPA
81.2
EUR/MWh
Merchant revenue
142.9 kEUR
PPA revenue
489 kEUR
Curtailed generation
424 MWh
Negative-price exposure
0 MWh

Monthly generation

Monthly revenue

Project cash flow

Equity cash flow after debt service.

Price sensitivity

NPV under lower, base and higher merchant-price scenarios.

Methodology and limitations

  • Futures anchoring shifts each month of the hourly shape to the most granular available month, quarter or year settlement.
  • Years beyond futures coverage use the last covered annual price and the editable terminal escalation.
  • BESS dispatch is a chronological daily heuristic, not a claim of mathematical optimality.
  • Ancillary-services revenue is a manual assumption and is not presented as ENTSO-E data.
  • Taxes, inflation, detailed debt sculpting, imbalance costs and site-specific engineering losses are outside this indicative model.